Go to a hardware store and purchase 2x4x100 inch 5 08x10 16x254 cm boards.
Add board in attic.
Any new batt or roll insulation installed over existing insulation in the attic needs to be without a vapor retarder face.
Sistering is the process of adding a new joist next to each existing joist.
Any existing batt or roll insulation in the attic should have the facing against the attic drywall floor or no facing at all.
Foam insulation boards are the best material with which to work when undertaking a do it yourself project because foam.
Attic hatch or door.
Maneuvering heavy 4 x 8 sheets of plywood or osb oriented strand board up to an unfinished attic is sometimes like trying to fit a square peg into a round hole.
Installing foam insulation boards in the attic is no that hard and can save you money compared with professional installation.
Can you add attic flooring.
Don t add flooring until you review wiring and plumbing needs for the future.
Build a new floor base with this in mind.
Spray insulation to the corners and perimeter of the attic first working your way into the center.
Measure and cut boards to size.
To properly add an attic storage deck start by measuring the largest area available that is not hindered by any ductwork.
Add weatherstripping around the perimeter and a sweep to the door of a walk up attic.
If the attic joists are not adequate one way to strengthen the floor for live loads is to sister the old joists.
The vapor retarder on top of or between layers of insulation can trap moisture.
Pull down stair or ladder.
Use a handsaw or circular saw to cut the boards to your measurements.
Strengthening attic joists for live loads by sistering.
For joists spaced 24 inches oc use.
You can install inch plywood or oriented strand board osb in 4 foot by 8 foot panels over existing 16 inch oc joists.
Measure and mark the length of the boards so that they run across the attic trusses.
Have a friend add material to the hopper while you direct the blower or hose.
Affix rigid foam insulation to the attic side of the hatch or door.
In the future you may want to construct a small apartment or master suite in the attic.
To eliminate any potential problems with wiring or insulation use two by four or two by six lengths to create a subfloor system for the new decking.
Use a zippered insulated tent to keep the enclosure draft free attic tent at 7 attic cover insulator 120.
And preferably can avoid any existing roof support.
If your boards aren t long enough cut multiple boards.